Projects under construction
Soline projects - family house
Construction start: September 2019.
Planned competion: 2022..
Location: Soline, Grad Korčula
Facility size: 300 m2
Concrete construction
Lumbarda - House
Construction start 2019.
Planned completion 2022.
Location Lumbarda
House area 110 m2
Prizba - Second row from the sea
Prizba
Second row from the sea
Surface:
Basement 68.86 m2
Ground floor 58.53 m2
Terrace 68.78 m2
Pool 14.54 m2
Start of works 01.10.2021
Planned completion of works 2022
Vinačac - south side of the island of Korčula
Vinačac south side of the island of Korčula
Second row from the sea
Land area 800 m2
Building area 166 m2
Garage area 36.51
Pool area 24 m2
Terrace area 80 m2
Material: concrete
start of works 2021
Planned completion of works 2022
Tri Porti Vila
Construction start Autumn 2020.
Planned completion December 2021.
first row to the sea
4 bedroom and 4 bathroom villa
Cencrete fasade, concrete finishing interior walls
Residential building in Vela Luka
Residential building with three residential units and a basement and fun zone on the roof terrace.
- Swimming pool equipped with the most modern and high quality equipment.
- Start of construction in 2022. - planned completion in the summer of 2023.
- Reinforced concrete construction
- Ventilated facade / glass
- Kids playground.